Setting in MRP 3 view of the material master
On the MM side the check is as follows;
Customizing
Materials Management à Consumption Based Planning à Planning à MRP Calculation à Stocks à
Define Safety Stock Availability
Define Stock in Transfer and Blocked Stock Availability
From the production side the availability checking rule is as follows;
Customizing
Production à Shop Floor Control à Operations à Availability check à all nodes
0 comments:
Post a Comment