Setting in MRP 3 view of the material master

On the MM side the check is as follows;
Customizing
Materials Management à Consumption Based Planning à Planning à MRP Calculation à Stocks à
                                                    Define Safety Stock Availability
                                                    Define Stock in Transfer and Blocked Stock Availability

From the production side the availability checking rule is as follows;
Customizing
Production à Shop Floor Control à Operations à Availability check à all nodes